Before removal of the stairs and balcony


After, but still some more to do


Before and during the demolition phase
Kitchen

The gas heater and water heater are removed and new electric HVAC and water hearter will be installed in another room. This will allow a apacious kitchen. The floor was removed and additional floor joists added to even up the floor.


After the demolition phase
Kitchen

New sub-flooring, electrical wiring, recessed lighting, drywall and plumbing.


Beginning of the build phase
Kitchen

New hardwood flooring (Brazillian Mesquite), room painted and electrical completed
View to the bath and a view of the utility room plumbing for the waster/dryer


From start to finish for the
Kitchen

New hardwood flooring (Brazillian Mesquite), room painted, new black appliances, Kohler cast iron sink with cutting board, hand sprayer and disposal unit, Whirlpool refrigerator withice maker, GE microwave with rotateing plate, GE glass top stove, brushed nickel appointments, wireless remote controlled fan, recessed lighting and Frigidaire dishwasher. Final completion pictures coming soon.


Original picture taken from the living room towards the dining room. The current picture taken from the dining room towards the living room.